Challenge
The lighting was at a high level within a busy production environment and we needed to carry out works with little disruption to the factory’s everyday operations.
Solution
With the use of specialist equipment, we were able to access all high-level fittings above tanks and pipe work to replace the old lighting with LED on a point-for-point basis, reducing the installation costs to the client.
Result
The project not only improved the factory’s lighting levels to ensure compliance with CIBSE recommendations for industrial manufacturing, but it also reduced the client’s lighting costs by over 50%.